翻訳と辞書 |
SK hydro
SK Hydro also known as Suki Kinari HPP, is an under construction run-of-the-river hydropower project located on the Kunhar river in the Kaghan valley of Mansehra District Khyber Pakhtunkhwa, which has an installed generation capacity of 840 MW. The project is one of the largest in private sector power development.〔http://www.skhydro.com/about-us/sponsors.html〕 The feasibility study had been carried out by various International firms since 1960's by German GTZ, Quebec based Montreal Engineering and recent detailed design and engineering study was performed by Mott Macdonald of UK.〔http://www.pcq.com.pk/suki-kinari-hydropower-project-pakistan/〕 ==References==
抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「SK hydro」の詳細全文を読む
スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース |
Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.
|
|